Facilities Maintenance:

Professional Contract Services Inc. has two full facilities contracts which include Facilities Maintenance/Other Support Services at the Air Base Ground Defense Campus Training Site, Camp Bullis, TX and Operations and Maintenance and Engineering Services at Buckley AFB Annex. PCSI has several maintenance trades working in these full facility contracts including: HVAC Technicians, Electricians, Alarm Techs, Painters, Carpenters, Locksmith, Plumber/Pipe fitters, Grounds Maintenance workers, Janitorial, Stationary Engineer, General Maintenance workers, Engineering Technicians, Resource Managers, Quality Control and Administrative personnel. PCSI operates and maintains two Maintenance Management System (MMS) and an Energy Management and Controls System (EMCS). PCSI operates and maintains a 31 MMBTU heating plant, 1900 Ton chiller plant, 2300 kW emergency power plant, and a 750 kVA uninterrupted power supply system. PCSI provides complete maintenance and repair of all utilities, fire alarm and suppression systems, elevators, and energy management systems along with grounds maintenance and snow removal operations.

Operations and Maintenance Engineering Services to Buckley AFB Annex, Colorado: PCSI operates and maintains a 36 acre Annex to Buckley AFB in Denver Colorado. The Annex campus consists of three office buildings and one warehouse with a total of 696,105 square feet (SF) of office space and 14,626 square feet of warehouse space. PCSI employs a crew of one Engineering Technician, one Resource Manager, one Supply Technician, a Parts and Tool Room Attendant, three licensed Electricians, one Fire Alarm Technician, two licensed Plumbers, one Stationary Engineer, two certified HVAC Technicians, one Locksmith, four General Maintenance Mechanics, one Maintenance Trades Helper, one Administrative Clerk, one Service Call Dispatcher, and six Grounds Maintenance Workers as well as supervisory and quality assurance personnel. All essential services and emergency responses are provided seven days a week twenty-four hours a day.

Infrastructure Maintenance: PCSI maintains and repairs a storm water sewer system with 2 lift pumps and oil water separator to protect wet lands on the site, a water distribution and a sanitary sewer system with lift station, two irrigation systems, natural gas and exterior electric distribution systems, and traffic control devises and signs. We maintain and repair and provide snow removal for over 27 acres of parking areas, roadways, and walkways as well as grounds maintenance and landscape improvement.

PCSI has completed various projects on the roads and parking lots such as designing and relocating a new layout of the security barriers at the base entrance and have repaired an upheaval in the parking lot which was causing pedestrian safety and drainage problems. Other infrastructure projects designed and executed by PCSI include replacing sewerage lift pumps to return lift station to design capacity, replacing traffic control signage to conform to Air Force standards, and repairing a retaining wall at perimeter fence.

Facility Maintenance: PCSI operates, maintains, constructs, installs, and modifies, all Air Force real property and real property equipment at the Annex which includes Facility finishes, roofs, and plumbing, HVAC, Interior electric, Fire Suppression and Alarm Systems. PCSI has instituted a comprehensive preventive maintenance (PM) program for all equipment in the facility which has increased life expectancy of equipment, reduced down time, and saved replacement costs. The government has already noticed significant reductions in utility costs and their engineers have adopted our PM program for the rest of Buckley AFB.

Plant Operations: PCSI operates and maintains a physical plant in the main 660,000 SF building which consists of a 31.8 MMBTU duel fired heating plant, a 10,000 and a 5,000 gallon fuel oil storage tanks, a 1900 Ton chiller plant, a 750kVA Uninterrupted Power Supply, and three emergency power generators of 1,135kW, 750kW, and 500kW. Some of the bigger projects PCSI has completed to make the main plant operate more efficiently are, retrofit the final chiller from R 11 to R 123 refrigerant, re-tube two hot water generators, replace a steam converter that has been inoperative for more than 6 years, and rebuilt one of two HVAC control air compressors. We have also upgraded the energy management and control system (EMCS) for the HVAC system in 6 of the 24 mechanical rooms.

Engineering Services: PCSI plans, prioritizes, and executes all construction and modification projects on the annex. PCSI operates an AutoCAD system and have updated all drawings, prints and schematics into digital format and provide the government with digital as-built drawings at the completion of all new work. We also provide project folders, facility folders, maintain a warranty program, We also operate the Datastrean MP2 Automated Maintenance Management System to control and track, and schedule work orders, inventory, training, man hours and costs on every service call or project. We provide full contract management for all services and projects sub contracted out. We provide an Environmental Protection program and work closely with the Air Force Environmental Flight on all inspections and compliance issues. We have maintained a zero notice of violations on all environmental inspections.